Paint Shop Production Flow

Raw powder and liquid are feeding into the Mixer now, in the batch quantity. Follow the material through the standard mixing sequence: first the Filler...

Prompt

Source idea used to generate this video.

Paint shop production manufacture flowcharts. 1. Feed the n number Raw material into the Mixer (Powder & Liquid). 2. Provide the proper mixing as per standard (step by step - Filler stage, PVC stage & Adjustment stage). 2.1. Regular monitor of material temperature. 2.1.1 If temperature is high --> reduce the RPM or if the temperature is less --> increase the RPM. 3. Transfer to Service tank for hold up the material. 4. TRM (Three roll machine) - using for proper dispersion of the material. 5. Self-cleaning (Remove the unwanted material from the material before passing the storage tank). 6. Storage tank. 7. Hand filter. 8. Mono-pump 9. Bucket filter. 10. Weigh machine. 11. Packing drum. 12. Stickering process. Create an animation video.

Narration

Narration used to create this video.

Video narration

Raw powder and liquid are feeding into the Mixer now, in the batch quantity. Follow the material through the standard mixing sequence: first the Filler stage, then the PVC stage, and finally the Adjustment stage. During mixing, monitor temperature regularly. If the temperature rises too high, reduce the Mixer RPM. If it is too low, increase the RPM. Only the Mixer speed changes. Once mixing is complete, transfer the batch to the Service tank for hold-up. From there, send it through the TRM, the Three-roll machine, for dispersion. Next, self-cleaning removes unwanted material before the batch enters the Storage tank. The flow then continues through the hand filter, the Mono-pump, and the bucket filter. After filtration, the weighing machine measures the paint before it goes into the packing drum. Finally, apply the sticker for labeling. The batch is now filtered, weighed, packed, and labeled, ready for dispatch.